A handcut mural is a permanent fixture, and the installation decides how long it lasts. This is the guidance we issue with every piece — substrate, adhesive, sequence and finishing, zone by zone.

('
\n

Substrate: what the mosaic is happy to be fixed to

\n
SubstratePreparation
New plaster or renderFully cured, sound, flat to within 3 mm over 2 m, dust-free, primed
Painted plasterScore or key the surface, remove loose or flaking paint, apply a bonding primer
Existing ceramic tileDegrease, abrade gloss tiles, use a modified adhesive rated for tiling onto tile
Plasterboard / drywallOnly in dry areas; in wet areas use a tile backer board or tanking membrane
ConcreteFully cured, level, free of release agents and laitance
Pool shellStructurally sound, watertight, correct curing; epoxy or pool-grade cementitious system
\n

Adhesive and grout\n

For dry interior walls, a polymer-modified cementitious mosaic adhesive is normally correct. For wet rooms, exterior work and pools, we specify epoxy bedding and epoxy grout. Both are supplied to a specification issued with your mural, because the wrong adhesive is the most common cause of a mosaic failing.

\n

Grout colour is a design decision as much as a technical one. A grout matched to the surrounding tesserae closes the design up and makes it read as a continuous surface. A contrasting grout emphasises the grid. Tell us which effect you want and we will specify accordingly.

\n

\n

Installation sequence for a sectioned mural

\n
  1. Unpack and check. Lay out the numbered sections and verify against the setting-out drawing before anything is fixed.
  2. Set out. Establish the centreline and datum from the drawing. For a design with a dominant horizontal — a horizon, a waterline — the datum line is critical; get it right first.
  3. Start from the centre or the datum. Work outward. This keeps any accumulated error at the edges where it can be trimmed, rather than in the middle of the design.
  4. Bed the sections. Apply adhesive to the wall, press the section in, and check level and alignment continuously.
  5. Remove the carrier. For face-mounted work, the paper or film is removed once the adhesive has set, following the method statement — usually a controlled soaking or a peel after a set interval.
  6. Clean carefully. Remove adhesive residue from the face before it cures. Do not use acidic cleaners on glass or gold leaf.
  7. Grout and finish. Grout after the tesserae have set, clean down, and seal cementitious grout where specified.
\n

Handling and storage before installation

\n

Store sections flat, indoors, out of the sun. Face-mounted paper should not be wetted before installation. Do not stack heavy items on the sections. If the mural will sit on site for more than a few weeks, keep it dry and check it for movement before installation.

\n
Related

Related

FAQ

Installation questions

Can my own tiler install the mosaic?

Yes, and most of our clients do exactly that. A competent tiler who follows the method statement and the setting-out drawing will achieve a good result. For very large or complex schemes we can advise on installation or help you select a specialist mosaic installer.

\n

How long does installation take?

A single-section panel takes a few hours. A large multi-section mural is usually one to three days for two installers, plus curing time before grouting and any sealing.

\n

Do you provide the adhesive and grout?

We supply the specification, and can supply the materials if you prefer — particularly the epoxy systems, which are harder to source locally in some markets.

',)

Commission Your Mosaic Wall Art

Send us your artwork and wall size — get a free custom mosaic design plan and quotation within 24 hours.

✅ Inquiry sent! We will reply within 24 hours.
⚠️ Submission failed — your email app has been opened with the inquiry pre-filled. Just press send, or chat with us on WhatsApp.

Submitting sends your inquiry straight to our inbox — or chat with us instantly on WhatsApp.